With a world-class graphite project in Tanzania (East Africa), The Pula Group, LLC is committed to a greener future. The high-quality graphite mineralization includes jumbo flakes developed to a depth of 60 meters, a key driver ensuring the project economics are strong. The Pula graphite deposits are extensions of the Nachu graphite deposits. PGP is taking a modular approach to mining and processing graphite, an innovative and efficient approach to optimize the success of the project during the ramp-up phase. This adaptive approach to mining helps mitigate economic risk and the "too big to fail" attitude that has sunk many large-scale mining projects. The PGP model provides a clear way to reignite the capacity for junior mining companies to activate the sector with minimal risk and maximum benefit to communities.
Along with the high caliber of its Tanzanian graphite opportunity, The Pula Group, a U.S.-based company, is setting high ethical standards in the mining sector. The Group's subsidiary for developing the project is Pula Graphite Partners (PGP), a 50-50 joint venture with local strategic partners. Even during the exploration phase, PGP already has a superior track record of philanthropy.